Starvo logo
Stasiun Starvo dengan multiple charging bays

Ultimate Tier · Intercity Flagship

A mega-hub for national tier-1 locations.

30 bays of DC ultra-fast 120 kW on a 3,000+ m² site. A dedicated PLN substation with a large transformer. Designed for airports, rest areas, and districts with peak intercity-travel demand.

Ultimate Configuration

Flagship scale, tier-1 infrastructure.

The Ultimate tier requires a large land and grid commitment — but the payoff is comparable: the highest throughput, a district magnet, and flagship status at strategic locations.

Specifications

Chargers
30 × SIRIUS 120 kW
Simultaneous bays
60 (2× CCS2 per unit)
Total power
3,600 kW
Minimum land
3,000+ m²
PLN supply
Dedicated substation + large transformer

Ultimate Build

Mega-hub-class infrastructure.

  • Medium-voltage PLN substation

    A dedicated substation with a 20kV → 380V step-down transformer. Capacity sufficient for the peak load of 60 simultaneous bays.

  • Large-span architectural canopy

    A heavy-duty steel structure with a 30+ meter span. White PVDF membrane or zinc-aluminum profile, design coordinated with the landlord's brand.

  • Multi-lane layout

    60 bays arranged in multi-lane parking (parallel or angled). Clear markings for in/out traffic flow, accommodating pickup trucks down to sedans.

  • Customer waiting area

    A lounge with seating, restrooms, and F&B integration. Designed for a 30–60 minute charging wait.

  • A district magnet

    Flagship visibility from the main road. Mega lighting and iconic STARVO branding. Photogenic for media coverage.

  • Future-proof scaling

    The substation is dimensioned with 30% headroom. The bay layout accommodates an upgrade to 250–400 kW (the GB400 line) in the future.

Ultimate Pipeline

Currently in negotiation.

Soekarno-Hatta AirportNegotiation Stage

Charging-station placement across T1, T2, T3. Site plan and 3D rendering available for review. In cooperation with Angkasa Pura — a strategic Starvo partner with a track record of formal cooperation.

A 3,000+ m² site with high grid capacity?

The Ultimate tier needs deeper due diligence. We review feasibility, grid capacity, and projected demand in an initial workshop.

Discuss a Workshop

FAQ

Frequently asked questions

What is the Ultimate tier?

An intercity flagship mega-hub with up to 30 bays of DC ultra-fast 120 kW per station.

How much land and power does it need?

A 3,000+ m² site with a dedicated PLN substation to support the large capacity.

What locations is it for?

Airports, toll-road rest areas, and district mega-hubs with high vehicle volume.