Initial Phase
Sk-MIN- Chargers
- 6 × SIRIUS 120 kW
- Simultaneous bays
- 12 (2× CCS2 per unit)
- Total power
- 720 kW
- Minimum land
- ±1,000 m²
- Time-to-market
- 5 months

Prime Tier · Destination Charging Hub
6–18 bays of DC ultra-fast 120 kW per station. A tensile canopy, hotel-grade lighting, and scalability as demand grows. Already deployed at Mega Kuningan in an 18-bay configuration.
Prime Configuration
The Prime tier is built to scale. Start with 6 bays early on, then expand to 18 as utilization rises — without changing the fundamental footprint.
Build Standard
A white PVDF membrane on a steel structure. The Starvo logo prominent up front, visible from the main road.
Warm white LED under the canopy, accent lighting at each charger. Safe and welcoming for night-time charging.
International standard, accommodating mid-size SUVs down to sedans. Reflective paint markings for navigation.
Medium-voltage (MV) connected directly to a dedicated transformer. Not shared with other tenants' loads.
Real-time monitoring integrated with the Starvo Command Center. Incidents tracked and responded to within SLA.
Compliant with DKI Governor Regulation 31/2022, RDTR-compliant K2 zoning. Active ESDM SPKLU operator license.
Deployment Proof

Jakarta CBD · Sk-MIN (6 bays) being upgraded to Sk-MAX (18 bays). Anchoring the business district with support for 9+ EV brands.

Mega Kuningan · Premium hospitality and business-park integration. A charging station woven into the F&B and lobby experience.
Initial consult: we review land area, power capacity, and demand potential. No commitment, no cost.
Consult via WhatsAppFAQ
A premium destination charging hub with 6–18 bays of DC ultra-fast 120 kW per station.
Around 1,000–2,000 m², depending on the number of bays built.
Yes. You can start with 6 bays and grow to 18 without changing the fundamental footprint.
Business districts, retail hubs, and hospitality destinations. This tier is already deployed at Mega Kuningan and Grand Rubina.